20 July
Well, we are on the slippery slope to fall. Lots happening here in Bristol Mills. Installing a new propane-fired heating system after being here for 21 years. The ole oil-fired hot air system finally STB. Planning on saving BIG money with the new package. New boiler is no bigger than a Microwave but a wee bit bigger than a breadbox. It took the Canadians to develop a good unit in the Trinity series boiler manufactured in Sussex, New Brunswick. Definitely plan to visit the plant in September during our annual trip to the Maritimes.
Cane & Canvas still marches on albeit at a bit slower pace than in the past. Still have 4 boats to complete. Covering kits are moving at about two per month. Lots of recaning in house and promises of more for the winter. Will close the shop when the temp drops below freezing as there is no way in hell will I try to heat that "barn" come winter. With the new heating system installed, I'll have enough room in the cellar (definitely Not a basement) to work on one boat.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment